Bridge repairs scheduled on Route 101 in Hampton
HAMPTON, N.H. (AP) — Bridge repairs are scheduled to start on Tuesday, Sept. 15, on the New Hampshire Route 101 bridge in Hampton.
The New Hampshire Department of Transportation says the bridge deck and joint repair work is expected to take eight weeks to complete and will require single-lane traffic.
Signs and barrels will guide motorists through the traffic shift. The advisory speed limit through the work zone will be 40 mph.
